Civil engineering and site development.

A site plan brings together building placement, parking, access, utilities, and drainage. We help you work through those details, prepare the drawings and calculations, and respond to questions during plan review.

Site layout

  • Building placement and setbacks
  • Existing conditions and demolition
  • Property lines and easements from the survey
  • Phasing when the project happens in stages

Parking and access

  • Stall count and layout, including accessible spaces
  • Driveways, aprons, and sight lines
  • Truck access and turning where it matters
  • Sidewalks, ramps, and pedestrian routes

Utilities

  • Water and sanitary sewer connections
  • Septic and well coordination on rural lots
  • Utility easements and meter locations
  • Coordination with the utility provider

Grading and drainage

  • Finished-floor elevations
  • Lot grading and positive drainage away from structures
  • Swales, retention, and discharge points
  • Stormwater calculations for the project requirements

Construction documents

  • Erosion and sediment control plans
  • Construction access and staging notes
  • Paving, striping, and signage
  • Maintenance-of-traffic plans when required for roadway work

Throughout the review

  • Responses to plan review comments
  • Revised site sheets after utility or drainage comments
  • Coordination with the architect and contractor
  • Site visits in Orlando and Orange County when needed

Site plans show up earlier than people expect.

A lot of projects that feel like building permits turn into site plan reviews. These are common situations where site plans may be needed.

New commercial buildings

Building placement, parking, service areas, and connections to public roads.

Additions that change the site

More square footage often means more parking, more drainage, or both.

Change of use

A space that held one kind of business does not automatically work for another one.

New homes and lot development

Building placement, finished floor, grading, and utility connections on a lot that is being built on for the first time.

Start with a current survey.

A current survey gives us the property boundaries, easements, and site information needed to start the design. We review what you have and let you know if additional survey information is needed before drawing begins.

01

The survey

Property boundaries, easements, flood information, and elevations needed for the site design.

02

The intended use

What the property will be used for and roughly how much parking or traffic it will bring.

03

Utility information

Water and sewer availability, or the plan for septic and well if the lot is outside those service areas.

04

Any prior comments

If a reviewer has already looked at the project, those comments steer what the next version needs to say.

Questions about starting a site project.

What if I do not have a survey yet?

Tell us. We will go over what the property needs and what the jurisdiction expects, and you will know what to order before spending money on drawings.

Can you take over a project that is stuck in review?

Send the comments and current drawings. We will review what has been done, identify the changes needed, and confirm which parts we can take on.

Do you handle the drainage calculations?

We prepare the stormwater and drainage documentation that goes with the site plan, and we revise it when the reviewer has questions.

Start with the address and the intended use.

If you have a survey, send it. If not, tell us what you know about the lot and we will tell you what is needed next.